Route 23

More details have come out about plans to resurface Route 23 through all of downtown Ottawa. 

Knowing that it’ll be a mess to drive through, lane closures on the main drag will be done overnight, from 6pm to 6am.  Sidewalk work downtown and elsewhere along Route 23 will still go on during the day. 

The work zone actually goes from just north of Route 6 all the way through town to near the south side Kroger.  Resurfacing south of the river on Route 23 will go on during the day so there will be lane closures in that part of town.

The Route 23 construction project in Ottawa is expected to start Monday and last into late fall. 

Recommended for you